Bending: æ æ²
witness test订货人å¨åºçè¯éª
Welding: çæ¥
Threading: 车缧纹
Levelingï¼æ ¡å¹³
color identification 彩è²è¯å«
Alignmentï¼å¯¹å,å®ä½è°æ´
check against æ£æ¥, æ ¸å¯¹
Fixingï¼åºå®
Consoleï¼æ§å¶å°
cubicle室,箱
audit 审计
material certificate.ææåæ ¼è¯
vertical panelç«ç´é¢æ¿
power distribution panel é
çµç
gauge board仪表æ¿
beveling 磨æ棱,磨æè¾¹
local panel ç°åºé
çµç
grouting çæµ
fabrication å å·¥,å¶é
instrument rack 计æµå¨æ¯æ¶
tank gauge 液é¢è®¡
flushing å²æ´ï¼å¡«ç¼
analyzeråæå¨
piping管éæ·è®¾
tubingæ·è®¾ç®¡é
cable fittingçµç¼é
件
elbow.弯管æ¥å¤´
main pipe 主管é
bend.弯管弯头
solvent 溶å
postweld heat treatment çåçå¤ç
jig.夹å
·
arc gouging çµå¼§å¨å
chippingä¿®ç¢
machining æºæ¢°å å·¥
bridges.管å¼æ¡¥
clamp.夹é³
tack welding ç¹ç
butt welding 对æ¥ç
grinder. 磨åº
commencement.å¼å§
gusset plateè§ææ¿, å åºæ¿
process pipe å·¥èºç®¡é
land 纹é´è¡¨é¢
tee ä¸é管 ä¸åé¢ Tå½¢æ¢
opening å¼å£
reinforcing pad.补强å«,å¢å¼ºè¡¬æ¿
flux çå
wet developer 湿æ¾åå
blowholeæ°æ³¡,æ°å
inclusion æè´¨
imperfection 缺é·
limitation é度
valve é,é¸é¨
structural attachment ç»æé件
tapered allowance åå°ä½é
tack welding 平头çæ¥
sputter å·æº
scale åºæ
lateral translation侧å平移
weld joint çç¼, çæ¥æ¥å¤´
plug.å¡
fusion çè
base materialåºåºææ
lead foil é
ç®
intensifying screen å¢å
å±, å
å¢å¼ºå±
pressure test.ååè¯éª
film density.å½±çå¯åº¦
line numberè¡æ°
leak testæ¼æ³è¯éª
plate thickness çæ¿å度
restorationä¿®ç
field fabricated å·¥å°å¶é ç,ç°åºè£
é
ç
junction box.æ¥çº¿ç
flow sheet æµç¨å¾
vent æ¾æ°å, éé£å
drain æ水管
instrument air仪表æ°æº
blindæ¡æ¿
pipe arrangement 管é
ç½®
civil engineer.åæ¨å·¥ç¨å¸
bus duct æ¯çº¿æ§½
substationåç«
flow instrument æµé计
power distribution panel é
çµç
level instrument ä½é¢è®¡, 水平仪
pressure instrument åå仪表/åå计
level switch (ä¿¡å·)çµå¹³å¼å
³,
gage glass 液ä½ç»ç管
pilot tubeæ示ç¯
line check å°æ£ä¿®
recalibration.å¤æ ¡,éæ°æ ¡å
blinding plateç²æ¿
expansion joint 伸缩æ¥å¤´
hydrostatic pressure testéæ°´åè¯éª
pneumatic pressure æ°å
scaffoldingèææ¶
check valveæ¢åé
liquid penetrant examination液ä½æ¸éæ¢ä¼¤
test pumpè¯éªæ³µ
witnessed inspections ç°åºæ£æµ
hangeråæ¶
control valveæ§å¶é,
fabrication drawing å¶é å¾çº¸,å¶ä½å¾
schedule number表示管å£å度系åçå·ç
hydrostatic test .æµä½éåå¦è¯éª,æ°´åè¯éª
design pressure 设计åå
disposition notice å¤ç½éç¥ä¹¦
pipe stanchion 管æ¯æ±
bellow type 波纹管å¼
expansion joint 伸缩æ¥å¤´
vibration stopperï¼ åéå¨
subcontractor 转å
å
WPS Works Process Specification å
¸åå·¥èºè§ç¨
piping.管éç³»ç»
flange.å¸ç¼
sleeve å¥ç
ferritic .éç´ ä½ç
identification mark è¯å«æ å¿
stencil.模ç»çç,éè±æ¨¡æ¿
stamping .å²å
silicone paintç¡
æ èæ²¹æ¼
weld bead çç¼
automatic temperature recorder 温度èªå¨è®°å½å¨
penetrameter é度计
film vieweråºçè§å¯ç¨å
æº
civil workså建工ç¨ï¼å»ºçå·¥ç¨
lump sum price æ··åä»·æ ¼ ,ç»å
ä»·æ ¼
scrap materialåºæ
caulking metalå¡«éåé[éå±](ææ)
application drawingæä½å¾, åºç¨å¾
cable routingçµç¼è·¯ç±éæ©
channel basesæ²æ¸ åºåº
vertical panelç«ç´é¢æ¿
local panel ç°åºé
çµç
power distribution panel é
çµç
gauge boardæ ·æ¿, æ¨¡æ¿ è§åå°º
anchor bolt éå®èºæ
expansion bolt 伸缩æ , æ©å¼èºæ
field instrument.æºå¸¦å¼ä»ªè¡¨
instrument rack 计æµå¨æ¯æ¶,计æµå¨æ¡æ¶
tank gauge 油箱液ä½è®¡
guide wire 尺度[å®è·]ç´¢,å绳
name plateåç, åæ
lead pipeé
管
take-off valveè¾åºé
sub-headeråèç®±
air header éæ°ç®¡
pneumatic signalæ°å¨ä¿¡å·
steam trace å çè¸æ±½ç®¡é
electric heat tracing.çµä¼´éå ç
cable trunk çµç¼ç®¡é
stop endå°ç«¯
fire barriersé²ç«é´é
bonding wire æ¥å线, ç线
conduit box [çµ]导管å线å£
rigid conduits åæ§å¯¼ç®¡
flexible conduit软管
conduit entry 导管å¼å
¥è£
ç½®
road crossing duct bank平交éå£ç®¡éç»
Capping ends顶çæ«ç«¯
cable armorçµç¼é è£
Cable sheathçµç¼å
ç®å±
sealing compoundçµç¼è
coaxial cableåè½´çµç¼
loop testç¯è·¯æµè¯
sequence test.èé顺åºè¯éª
lintel beam 水平横楣æ¢
flash plateéªçéå±
anchor bolt å°èèºæ
expansion bolt伸缩æ , æ©å¼èºæ
shim plate å«æ¿
push button stationæé®å¼æ§å¶ç«
logic diagramé»è¾å¾
calculation sheet计ç®ä¹¦
flow instrumentæµé计
level instrument ä½é¢è®¡, 水平仪
layout drawing å¸ç½®å¾
tie bandææç¨å¸¦æ
Heating boxeså ç室
cutting openingåå
control valve actuator éæ§ä¼ å¨æºæ
air set空æ°ä¸ååº, 常温èªç¡¬ èªç¶ç¡¬å
solenoid valve.èºçº¿ç®¡é,çµç£é
calorimeterçé计
odometeråç¨æ
tachometer转é计
chronometerç²¾å¯è®¡æ¶è¡¨
温馨提示:答案为网友推荐,仅供参考