第1个回答 2007-04-01
Prepared to meet the depth of the contents of the preliminary design review and approval, and in accordance with the "chemical factory preliminary design depth of the contents of the documents provided" main content requirements.
Construction plans designed to meet the depth of the contents of the "chemical factory construction design depth of the contents of the documents provided" all documents conform to the design relevant standards and regulatory requirements, to meet the procurement and site construction requirements